Every year Amvic could not be more excited to showcase the great quality work that their customers achieve using Insulated Concrete Forms (ICFs). Not only do the ICF Builder Awards provide a platform to highlight the growth and positive impact of sustainable, energy-efficient living, but the event itself allows engagement and networking in an industry that can prove challenging against traditional construction methods. These awards continue to highlight growth and we couldn’t be prouder of this year’s winners.

Held in Las Vegas during the World of Concrete Show, Amvic took home five awards as well as People’s Choice awards in the small residential, unlimited residential, multifamily and light commercial categories. Winners are listed below:

ICF Builder Awards Categories

Small Residential (3,000 sq. ft. or less)**
Large Residential (3,001 to 6,000 sq. ft)**
Unlimited Residential (Over 6,000 sq. ft)**
Multi-Family (Duplex, Apartment, Hotels)
Light Commercial (less than $5 million)
Heavy Commercial ($5 million or more)
Specialty Applications  (Pools, Walls, etc.)

 

SUNSHINE GREEN HOME

Small Residential and People Choice Winner

 

PROJECT STATISTICS

Location: Hurricane, Utah
Type: Small Residential
Size: 2,805 sq. ft.
ICF Used:11,264 sq. ft.
Cost:$1,900,000
Total Construction Time: 20 weeks
ICF Installation Time: 70 days

CONSTRUCTION TEAM 

Owner: Zitting Family Trust, Lot 4 Copper Rock
General Contractor: Mortar and Beam Construction LLC
ICF Installer: Mortar and Beam LLC
Form Distributor: Mortar and Beam LLC
Architect: MRW Design
ICF System: Amvic

 FAST FACTS 

  • Equipped with solar 3 bed, 3 bath, 3 garages, and 12-foot ceilings in main home
  • Detached 2-bed, 2-bath, 867-sq. ft. guest casita
  • Two private Amdeck rooftop decks with pool and golf course views
  • Attached garage with 14-foot ceilings, rooftop deck, hot tub, and firepit
  • 42 solar panels above the living space

WOODS RESIDENCE

Unlimited Residential – 1st Runner Up

PROJECT STATISTICS

Location: Rising Fawn, Georgia
Type: Small Residential
Size:8,405 sq. ft.
ICF Used: 17,454 sq. ft.
Cost: $1,580,000
Total Construction Time: 52 weeks
ICF Installation Time: 60 days

CONSTRUCTION TEAM 

Owner: Bob and Nadine Woods
General Contractor: Caldwell Homes LLC
ICF Installer: Caldwell Homes LLC
Form Distributor: Amvic
Architect: Caldwell Homes LLC
ICF System: Amvic

FAST FACTS 

  • 19-foot high freestanding gable walls on both ends of the home
  • Second-story Ecodeck porch spanning 11×76 feet
  • QMI – Rolladen shutters concealed above every door and window
  • 4-stop elevator from safe room to attic
  • Unico high-velocity HVAC system using water-heated coils & Navien boiler
  • First ICF home project by the builder

GARNET WAY

Unlimited Residential & People Choice Winner

PROJECT STATISTICS

Location: Penticton, British Columbia, Canada
Type: Residence
Size: 7,072 sq. ft.
ICF Used: 16,330 sq. ft.
Cost:$5,100,000
Total Construction Time: 82 weeks
ICF Installation Time: 91 days

CONSTRUCTION TEAM 

General Contractor: Okanagan Extreme Home Builders
ICF Installer: Okanagan Extreme Home Builders
Form Distributor: Home Hardware Building Centre
Architect: Okanagan Extreme Home Builders
ICF System: Amvic

FAST FACTS 

  • The home was designed to fit exactly on the top of the rock surface
  • The bottom of the ICF pool is the mountain rock
  • Every foundation, building, pond, and pool is ICF
  • Solar-ready to achieve Net Zero
  • Zero fiberglass insulation in the home

THE TOM

Multi-family low rise – 1st runner up

PROJECT STATISTICS

Location: Huntsville, Ontario, Canada
Type: Condominium
Size: 41,979 sq. ft.
ICF Used:43,565 sq. ft.
Cost:  $9,200,000
Total Construction Time: 65.7 weeks
ICF Installation Time: 95 days

CONSTRUCTION TEAM 

Owner: Greystone
General Contractor: Greystone
ICF Installer: Greystone
Form Distributor: Amvic
Architect: Duncan Ross Architect
ICF System: Amvic

FAST FACTS 

  • 30-unit residential building with underground parking and amenity room
  • Limited to 3 floors due to zoning
  • The first phase of the development of 15 similar buildings
  • Concrete was poured in subzero temperatures
  • The use of ICF provided an accelerated schedule

ROTEN INSURANCE OFFICE

Light Commercial Winner

 

PROJECT STATISTICS

Location: San Antonio, Texas
Type: Office building
Size: 5,650 sq. ft.
ICF Used: 4,687 sq. ft.
Cost: $1,150,000
Total Construction Time: 30 weeks
ICF Installation Time: 6 days of stacking

CONSTRUCTION TEAM 

Owner: Robert Roten
General Contractor: John Alvarez
ICF Installer: ICF Constructors
Form Distributor: Amvic
Architect: ArchitecturaSA Inc.
ICF System: Amvic

FAST FACTS 

  • Tight 0.32-acre lot
  • Energy Star Certified Building score of 93
  • First local project to receive a utility rebate for using ICF
  • Only 6 days for wall stacking and fenestration openings
  • Double-stacked corner windows supporting the mezzanine

 

To learn more on how you can build your dream project with Amvic, contact one of our experts today!

The quick and easy installation of Amvic’s ICF enables contractors and builders to speed up installation time, maintain a clean job site and build to a higher standard of performance by using Amvic’s innovative insulation products.